- Other Construction Machinery[10]
- Elevators[10]
- Construction Lifter[10]
- Hoists[10]
- Work Platforms[2]
- Concrete Pumps[1]
- Contact Person : Ms. li herry
- Company Name : Jinan Beidou Construction Works Machinery Co., Ltd.
- Tel : 86-531-83821919
- Fax : 86-531-83821919
- Address : Shandong,jinan city,Xianggong Town,Jinan city,Shandong province,PRC
- Country/Region : China
- Zip : 250203
SC200 construction cargo elevator
Safety Equipment Measures:
1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.
3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.
4.Overload calling device
5. upper and lower travel limit: They can limit the cabin go over the top mast.
6.The top mast section have no rack in order to limit the cabin overrunning and dropping .
7. Manual button: You can operate the botton to let the cabin go down when interruption of power supply
Emergency switch: When the cabin losing control and over-runing, you can operate the button.
Equiped with the most optimal Anti-dropping safety equipment,which restricts the excessive downward movement of the cage and prevents cage falling accidents,makes the dewice absolutely reliable.
A. Cabins (Cages) :
1. Aluminum alloy plate punching
2. Aluminum alloy plate punching+ wire mesh
A. Mast Sections
Painting: Red Specifications: 650*650*1508mm2. Being Galvanized Specifications: 650*650*1508mm
3. Painting: Orange Specifications: 800*800*1508mm
A. Driven unite
1. Treble drive 3*11Kw for lifting capacity 2Ton
2. Dual drive
a. 2×11Kw for lifting capacity 1Ton
b. 2*15Kw for lifting capacity 2Ton
3. New save-energy type: 2*12Kw for lifting capacity 2ton
SC200 construction cargo elevator